Monday, October 26 2020
40T Trane Chiller maintenance(#1 & #2)

Chiller Maintenance / the maintenance to the Trane Chillers will be done by Climacor.
According with the procedure first Chiller to be maintained will be the FCS unit ( Chiller # 2 ), during this time the floor cooling will not be running and then the BCS Unit( Chiller #1) will be maintained and the DECam cooling system will be transferred to the Chiller # 2, after this is done, the Chillers will be switched back


Email Address:  
   Sign up to be notified by email 3, 2 and 1 days before this event takes place.

Download as iCalendar