Friday, December 1 2017
Check List 4 M

items
p.m. support - at zenith -on air
Compressor air press. ( psi) max/min
North gauge press. ( psi)
South gauge press (psi)
South dial indicator (inch)
n.e. dial indicator (inch)
n.w. dial indicator (inch)
f/8 mirror - at- zenith -under vacuum
vacuum pump (inches hg) max / min
mirror vacuum gauge (inches h20)
hydraulic system
starting pump press. (psi) / pump # 1
working pump press. (psi)
oil temp. at pump assembly
amount of oil in system tanks
min. oil thickness / pressure at:
s.e. upper pad to h.s. journal
s.e. sub-pad to upper pad
s.w. upper pad to h.s. journal
s.w. sub-pad to upper pad
n.e. radial upper pad to journal
n.e. radial sub-pad to upper pad
n.w. radial upper pad to journal
n.w. radial sub-pad to journal
n.e. top thrust pad to journal
n.e. bottom thrust pad to journal
n.w top thrust pad to journal
n.w bottom thrust pad to journal
compensating bellows
silicon oil press. (psi) telescope on oil
minimum clearence - east side (inch)
minimum clearence-west side (inch)
incremental encoders
r.a. encoder & contact surface quality
dec. encoder & contact surface quality
drives torque with best possible balance
max. torque east with telescope
max. torque west in slew and
max. torque north after breakaway
max. torque south


Download as iCalendar