Problems:
* Our night (DECamSV team's) was to start at 1:30AM, like al this run, but around 1:15AM at the end of DES observations, the air support for the mirror failed. It was recovered, observations resumed, but the system failed again. After several checks, tests, and finally assistance from Javier Rojas (Electronic Engineer), they determined is a more serious fix that can not be done now, has to wait to the morning, so they night was called at 1:45AM...