ENR CTIO Blanco 4-m 2012-11-28

Date: 
Wednesday, November 28, 2012
Telescope: 
CTIO Blanco 4-m
Submitter: 
David James
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
Jennifer Marshall, J-P., Rheault
Problems: 

SISPI was producing bad images for about one hour due to IB5 being incorrectly re-started after the Monsoon crate crash during the day.

Comments: 

None.

Conditions: 
General Conditions
Comment: 
Cloudy

Quarters

Program: 
Proposal: 
DECal calibrations
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.75
Time lost technical: 
1.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Spectrophotometric scans of DECam filters
Primary Investigator: 
Darren DePoy (Texas A&M University
Institution: 
CTIO
Instrument: 
CTIO 4m RcSpect
Organization: 
NOAO
Total Program Time: 
9.75
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2012-11-28 0.0 8.75 1.0 0.0 0.0 9.75