ENR CTIO Blanco 4-m 2012-12-09

Date: 
Sunday, December 9, 2012
Telescope: 
CTIO Blanco 4-m
Submitter: 
Huan Lin
Observer Support: 
Mauricio Rojas
Night Assistant: 
Leonardo Paredes
Also Present: 
Liz Buckley-Geer, Jim Annis
Problems: 
Donuts stopped working but we didn't notice for about 40 min. Lost about half hour debugging problem and restarting Donuts and AOS.
Comments: 
None.
Conditions: 
General Conditions
Temperature Max: 
15.00
Temperature Min: 
12.00
Humidity Max: 
50
Humidity Min: 
40
Wind Speed Max: 
6.00
Wind Speed Min: 
0.00
Comment: 
None.

Quarters

Program: 
Proposal: 
2012B-0003
Target of Oportunity: 
No
Time Observed: 
6.75
Time Engineering: 
0.5
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DES SV
Primary Investigator: 
Josh Frieman
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
7.25
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2012-12-09 6.75 0.5 0.0 0.0 0.0 7.25