ENR CTIO Blanco 4-m 2013-01-16

Date: 
Wednesday, January 16, 2013
Telescope: 
CTIO Blanco 4-m
Submitter: 
bob nichol
Submitter Email: 
bob [dot] nichol [at] port [dot] ac [dot] uk
Observer Support: 
Hernan Tirado
Night Assistant: 
Claudio Aguilera
Also Present: 
dave wittman, david gerdes, lyndsay Old, Kai Hoffmann
Problems: 

First half: No telescope problems

Second half: lost 45 minutes at handoff due to flawed logout/in procedure.

Comments: 

Clouds covering approximately half the sky were a problem most of the night, causing problems with centering of DECam fields and affectig depth. Lost some time trying to avoid the clouds

Conditions: 
General Conditions
Comment: 
None.

Quarters

Program: 
Proposal: 
003
Target of Oportunity: 
No
Time Observed: 
3.25
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.25
Time lost other: 
0.0
Description: 
DES
Primary Investigator: 
frieman
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
3.5
Proposal: 
2012B-0448
Target of Oportunity: 
No
Time Observed: 
3.0
Time Engineering: 
0.0
Time lost technical: 
0.75
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DLS u
Primary Investigator: 
Thorman (Wittman observing)
Institution: 
UC Davis
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
3.75
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2013-01-16 6.25 0.0 0.75 0.25 0.0 7.25