Jump to Content
CONTACT US
Twitter
Facebook
CTIO
Old CTIO Site
Old AURA-O Site
NOAO
About
CTIO Staff
CTIO History
CTIO Directors
Historic Highlights
Site Description
Contact Us
Astronomers
Create a night report
Night report calendar
Observing
Proposal Information
Visiting Astronomers Travel Guide
Travel Information Questionnaire
Your Observing Run
Telescope Schedules
Astronomer's Tools
SOAR Visitor's Guide
Visitor's Computer Guidelines
Network Connection Request
Instruments
Instruments by Telescope
IR Instruments
ANDICAM
ISPI
ISPI Exposure Time Calculator
OSIRIS
Spartan
Optical Imagers
DECam
0.9-m CCD
Goodman
MOSAIC II CCD Imager
SOI
Optical Spectrographs
1.5-m R-C Spectrograph
CHIRON
Goodman
Hydra
Filters
Telescopes
Blanco 4-m Telescope
Instruments for Blanco 4-m Telescope
SMARTS
0.9-m
1.0-m
1.3-m
1.5-m
Hosted Projects at CTIO
ALO
Curtis-Schmidt 0.6-m
GONG
LCOGT
PROMPT 6x 0.4m
SARA-South 0.6-m
SSI Airglow
WHAM 0.6-m
SOAR
SOAR Instruments
SAM
Observing at SOAR
SOAR Instrument Setup Forms and Observing Reports
SOAR End-of-night Reports
Gemini South
LSST
Optical Engineering
AURA Sites Group
RoboDIMM
New Projects
NOAO Future Instrumentation
DECam
COSMOS
SAM
LSST
MONSOON
What is MONSOON
Tripespec 4
AURA Sites Group
Talks and Meetings
Upcoming Colloquia
Sky Conditions
Tololo Environmental Page
TASCA
RASICAM Infrared Sky Image
CTIO External Webcam
Sky brightness measurements
Historical Record of Sky Conditions
NOAO Newsletters
NOAO Data Archive
NOAO Library
Library/Casino Project
Astronomical Links
Visitor's Computer Guidelines
News
Announcements
News Articles
Outreach
NOAO-S EPO Programs
CADIAS
Astro Chile
Hugo E. Schwarz Telescope
Dark Sky Education
Preserving the Dark Skies
La Oficina de Protección de la Calidad del Cielo del Norte de Chile – OPCC
Light Pollution
StarLight Universe
The World at Night (TWAN)
International Dark-Sky Association (IDA)
Students
REU Program
CTIO REU Application
REU Recommendation Letter Submission
PIA Program
CTIO PIA Application
PIA Recommendation Letter
GO-FAAR Program
Other Opportunities
Visit Tololo
Media Relations
News
Press Release
Publications
Seminar Journalist
Multimedia Gallery
Galleries
EPO/CADIAS Calendar Activities
NOAO-S EPO Program team
Tololo & Tourism
Visits to Tololo
Astro tourism in Chile
Tourism in Chile
Information for travelers
Employment
Login
Search form
Search
title
description
‹
›
You are here
CTIO Home
» ENR CTIO Blanco 4-m 2013-01-21
ENR CTIO Blanco 4-m 2013-01-21
Date:
Monday, January 21, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alberto Alvarez
Submitter Email:
aalvarez
[at]
ctio [dot] noao [dot] edu
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Gerdes, Old, Hoffmann / Klein, Miller
Problems:
Conditions:
General Conditions
Comment:
Monday, January 21, 2013 Telescope: CTIO Blanco 4-m Submitter: Bob Nichol Submitter Email: bob.nichol@port.ac.uk Observer Support: None Night Assistant: Alberto Alvarez Also Present: Hernan Tirado Gerdes, Old, Hoffmann Problems: In afternoon, exposure queue hung with flats with DECam interface saying TCS was unresponsive. Restarting the TCS solved the problem Comments: Bad seeing and thick cloud came in from roughly 00:15 local time. Much of the data was with seeing > 1.5 and had trouble guiding. Monday, January 21, 2013 (second half of night) Telescope: CTIO Blanco 4-m Submitter: Adam Miller Submitter Email: amiller@astro.berkeley.edu Observer Support: None Night Assistant: Alberto Alvarez Also Present: Chris Klein Problems: The beginning of our observations featured thick clouds and poor seeing, however, the tracking issues that affected our images from two nights ago were gone during an initial sequence of images that were 40 s exposures followed by slewing to another field. However, after ~30 images were taken the tracking issues returned (during a sequence of 20 s exposures followed by slewing). After the tracking issues, namely elongation in the images in the RA direction, persisted for ~1 hour, we paused observations and sent the telescope to zenith. We obtained a sequence of test images at zenith which showed no tracking issues. We returned to our field and continued observations - the elongation issues persisted at this point but the amplitude of elongation was significantly improved relative to the previous sequence. It appears that after a moderate slew (anything between 60 and 5 deg) the image quality is significantly better if several images are taken in a single location prior to initializing the observing sequence. This theory should be tested in greater detail. We would also not recommend exposures shorter than 20 s if they are to be immediately followed by slews. Also, the guider GUI was not updating with guiding information (though the guider did appear to be working throughout the night). Somewhat inexplicably at the very end of the night (after twilight started) the guiding GUI started working again. We performed a configure command with the observer console which may have led to this difference.
Quarters
1st Quarter
Clouds:
Clear
Wind:
Low
Seeing Value:
1.00
Seeing Variability:
0.2
Seeing Source:
The Telescope I used
Sky :
1
2nd Quarter
Clouds:
Cirrus
Wind:
Low
Seeing Value:
1.50
Seeing Variability:
0.6
Seeing Source:
The Telescope I used
Sky:
5
3rd Quarter
Clouds:
Partially cloudy
Wind:
Low
Seeing Value:
1.50
Seeing Variability:
0.4
Seeing Source:
The Telescope I used
Sky:
6
4th Quarter
Clouds:
Cirrus
Wind:
Low
Seeing Value:
1.50
Seeing Variability:
0.4
Seeing Source:
The Telescope I used
Sky:
4
Program:
Proposal:
003
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
0
Proposal:
2012B-0363
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Time Domain survey
Primary Investigator:
Bloom
Email:
amiller@astro.berkeley.edu
Institution:
U.Berkeley
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times
Time Observed
Time Engineering
Time lost technical
Time lost weather
Time lost other
Total Program Time
2013-01-21
3.5
0.0
0.5
0.0
0.0
4
Calendar
Printer-friendly version