First half of the night used to test the new damper motor controller. This appeared to function correctly, but the filter needs tuning, which is planned for tomorrow.
Second half of night was used to collect a pointing map data set with the hexapod NOT correcting for displacement nor tip/tilt.
First half of the night used to test the new damper motor controller. This appeared to function correctly, but the filter needs tuning, which is planned for tomorrow.
Second half of night was used to collect a pointing map data set with the hexapod NOT correcting for displacement nor tip/tilt.