ENR CTIO Blanco 4-m 2013-01-27

Date: 
Sunday, January 27, 2013
Telescope: 
CTIO Blanco 4-m
Submitter: 
Tim Abbott
Submitter Email: 
tabbott [at] ctio [dot] noao [dot] edu
Observer Support: 
Hernan Tirado
Night Assistant: 
Claudio Aguilera
Problems: 

None.

Comments: 

First part of night spent tuning up the damper motor.  There is still work to be done.  There was some improvement over last night in some parts of the sky, but other parts where the old damper worked better.  Michael is not without plans.

Second part of night spent collecting data for a pointing map and a hexapod lookup table.  Note: this takes less than 3 hours if you don't call the offsets over to the operator as you are going.

Conditions: 
General Conditions
Comment: 
None.

Quarters

Program: 
Proposal: 
DECam T&E
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
7.5
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
7.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2013-01-27 0.0 7.5 0.0 0.0 0.0 7.5