You are here

ENR CTIO Blanco 4-m 2015-11-24

Primary tabs

Date: 
Tuesday, November 24, 2015
Telescope: 
CTIO Blanco 4-m
Submitter: 
Tim Abbott
Submitter Email: 
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
Humberto
Problems: 

TCS drive power supply replaced.

Various issues with Blanco network found and solved during the day with much assistance from Mauricio Rojas on Cerro Tololo and Jim Hughes in La Serena.

 

Comments: 

Successful night for LSST calibrations test engineering team of Chris Stubbs, Robert Lupton, Merlin, Michael, Kairn & Patrick.  Much learned.  Stubbs declares the exercise "a roaring success".

 

 

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Overcast
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky : 
8
2nd Quarter
Clouds: 
Overcast
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
8
3rd Quarter
Clouds: 
Overcast
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
8
4th Quarter
Clouds: 
Overcast
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
8
Program: 
Proposal: 
2013A-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
7.75
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
LSST Calibrations testing, collimated beam projector
Primary Investigator: 
Chris Stubbs
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
7.75
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2015-11-24 0.0 7.75 0.0 0.0 0.0 7.75