Date:
Wednesday, July 26, 2017
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Problems:
r filter failed to insert at calibrations and for observations. For the latter power-cycle of FCM plus restart SISPI needed. So after doing z band when the Moon was up, got r inserted and stayed with it until twilight when chnaged back to z. Klaus provided an archirect console command that will force the filters out without checking status, at 1 am. Need to test.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Legacy Survey
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-07-26 | 11.5 | 0.0 | 0.25 | 0.0 | 0.0 | 11.75 |
None.