CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

Inicio > Victor Blanco 4-m Telescope > Maintenance Procedures

Maintenance Procedures

LINKS

  • Active optics [1]
  • Focus settings
  • CO2 snow cleaning [2]
  • Wet washing
  • Re-aluminisation
  • Reflectometry

 

 

For more information go the Optical Engineering pages [3]


Source URL (retrieved on 02/09/2013 - 09:11): http://www.ctio.noao.edu/noao/es/node/601

Links:
[1] http://www.ctio.noao.edu/noao/es/content/active-optics-system
[2] http://www.ctio.noao.edu/noao/es/content/CO2-snow-cleaning-procedure
[3] http://www.ctio.noao.edu/noao/es/content/Optical-Engineering