Friday, April 12 2013
Day Time Engineering
Goodman Dewar Pumped

Cooling went off as a result of the great UPS disaster on 4/10
However. prior to this pressure had already risen to point pumping was under discussion (P~0.00112 Torr on 4/8 per SDP)
Pumping began at 12:15 on 4/10. Cooling was begun at 17:12 on 4/12 (P~0.003; P~0.001 when valve closed during cool down) and complete at 21:39